INDIAN LAKE DAM OPERATIONS AND MAINTENANCE SCHEDULE
Annually
1. Inspect and repair as required the spillway caulking
Bi-Annually
1. Grease winding gear every 6 months
2. Test winding gear to open/close the outlet pipe
Weekly
1. Inspect dam for any signs of seepage, minor breaches etc.
As Required
1. Cut grass on top and sides of the dam.
2. Clear excess debris from the spillway
Lakes/Dams Committee
November 2010